Skip to content

Free quotes and a 1-year warranty on our work: (817) 391-9567

(817) 391-9567

ServicesBathroom Remodeling

Bathroom Remodeling in Southlake

We rebuild tired bathrooms from the subfloor up: new showers, tubs, tile, floors and fixtures, done with proper waterproofing behind the walls. You get a clear written scope, straight answers about cost and a crew that keeps the rest of your home clean.

Over-the-shoulder view of a tile setter pressing white subway tile onto a thinset-combed shower wall, with a mortar bucket on the covered floor

When a remodel makes more sense than another repair

A bathroom wears out in ways you can see and ways you can't. Cracked grout and a dated tub are obvious. A shower pan that has been seeping for years, or a subfloor going soft near the toilet, usually is not, until it is.

Bathroom remodeling is the right call when the room no longer works for how you live, or when small fixes keep chasing the same problem. If a single leak or a cracked tile is the issue, we will tell you that a repair is enough. If the trouble runs deeper, we will show you what we found and explain why.

Many homes around Southlake still have the oversized garden tub and builder-grade shower from when they were built. Swapping that layout for a walk-in shower is one of the most common jobs we do, and it often makes the room feel twice as usable.

What our bathroom remodeling covers

Demolition and haul-off
We remove old tile, fixtures, drywall and flooring, then haul the debris away. Floors and hallways outside the bathroom are covered before anything comes out.
Shower and tub work
Tub-to-shower conversions, new tub installs and fully tiled showers. Every shower gets a properly sloped pan and a waterproofing membrane behind the tile, which is the part that decides whether a shower lasts.
Plumbing changes
Moving a drain, relocating a toilet or adding a second sink. On a slab foundation that can mean cutting concrete, and we explain that before you commit to a new layout.
Tile and flooring
Floor and wall tile, shower niches and benches, and moisture-rated flooring. We check that the subfloor is flat and solid before anything goes down.
Fixtures and finish work
Toilets, sinks, faucets, shower valves and trim, plus drywall repair, paint and ventilation fans so the room dries out after every shower.

Signs your bathroom is ready for a remodel

  • Soft or bouncy floor

    A floor that gives near the toilet or tub usually means water has reached the subfloor. That rarely fixes itself.

  • Grout that won't stay clean

    Dark grout lines and recurring mildew often point to water getting behind the tile, not just poor cleaning.

  • Water marks downstairs

    If your home has an upstairs bath, a yellowed patch or bubbling paint on the room underneath it means water is escaping somewhere. Have it checked before the drywall or framing takes more damage.

  • A tub nobody uses

    If the garden tub collects dust while everyone squeezes into a small shower, the layout is working against you.

  • Hard-to-reach fixtures

    Step-in tubs and low toilets get harder to use over time. A curbless or low-threshold shower can make the room safer for years to come.

How a bathroom remodel runs, start to finish

  1. 1

    A phone call and a visit

    You call us, tell us what bothers you about the room, and we set a time to come look. We measure, check under sinks and around the tub, and ask how you use the space.

  2. 2

    A written, line-item estimate

    You get a written scope that lists each part of the job. If something can't be known until the walls are open, we say so and explain how we would handle it.

  3. 3

    Demo and rough-in

    Old finishes come out, and we photograph anything hidden we find, like rot or old leaks, before deciding the next step with you. Plumbing and electrical rough-in happen here, along with any permit inspections that apply.

  4. 4

    Waterproofing, tile and fixtures

    The shower is waterproofed and tested, then tile, flooring and fixtures go in. Dust barriers stay up and we clean the work area at the end of each day.

  5. 5

    Final walkthrough

    We go through the room with you, run every fixture and fix anything that isn't right before we call it done.

Remodeler measuring the width of a gutted shower with bare cement board walls while a homeowner holds gray and marble-look tile samples

What moves the cost of a bathroom remodel

Two bathrooms the same size can cost very different amounts. The biggest swings come from layout changes, what is hiding under the old tile and the finishes you pick. We walk you through each one in your estimate so nothing shows up later as a surprise.

Keeping or changing the layout
Leaving the toilet, drain and shower where they are keeps costs down. Moving plumbing on a slab means cutting and patching concrete, which adds labor.
Condition behind the walls
Rotted subfloor, a failed shower pan or old galvanized pipe all need fixing before new finishes go on. We show you photos before doing extra work.
Tile choice and coverage
Large-format and natural stone tile take more prep and time than standard ceramic. Tiling a shower to the ceiling uses more material than a half wall.
Shower glass and fixtures
Frameless glass, thermostatic valves and multiple shower heads all raise the total. Standard options keep it lower without hurting function.

Common bathroom remodeling questions

Something not covered here? (817) 391-9567

How long will we be without this bathroom?

A simple remodel in the same layout typically takes a few weeks of workdays. New layouts, custom tile and permit inspections lengthen that. Your estimate includes a schedule, and we let you know if something shifts it.

Can the garden tub become a walk-in shower?

Yes, we get asked for this all the time. The tub and its deck come out, and we build a sloped, waterproofed shower pan and tile the new shower. Depending on the room, there may be space for a bench or a wider entry too.

What if demolition reveals damage?

Work pauses, we photograph it and walk you through it. You hear the repair choices and what each one costs before we continue. No extra work happens until you approve it.

Does a bathroom remodel require a permit?

Surface updates such as new tile often do not. Relocating plumbing, adding circuits or changing walls generally does. When one is needed, we get the permit and book the inspections.

Can the kitchen and bathroom be remodeled together?

Yes. Doing both together lets them share setup, scheduling and inspections. Have a look at our kitchen remodeling and whole home remodeling pages, and we can discuss pairing them when you call.

Remodeled kitchen seen from a dining table: white shaker cabinets, quartz island with three stools, white subway tile backsplash, glass pendants, and wood-look floor.

Tell us about your bathroom

Let us know what bugs you about the room and what you would like it to be. We'll come take a look and hand you a clear written estimate, with no pressure to sign.